Home > Massachusetts > Quincy > General Dynamics Corporation Shipyard, Outfitting Pier No. 3, 97 East Howard Street, Quincy, Norfolk County, MA
See 53 maps of this locationData Pages
No images were found.
Photo Caption Pages
No images were found.
Item Title
General Dynamics Corporation Shipyard, Outfitting Pier No. 3, 97 East Howard Street, Quincy, Norfolk County, MA
Location97 East Howard Street,
Quincy, MA
Find maps of Quincy, MA
Created/Published
Documentation compiled after 1968.
Notes
Survey number HAER MA-26-D
Building/structure dates:
1942 initial construction
Building/structure dates:
1984 subsequent work
Significance: Constructed in 1942-43, Pier 3 is significant as an integral component of the Quincy-Fore River Shipyard facilities from the World War II period until the closing of the yard in 1984. Fitting out is the last phase of ship construction prior to sea trials and completes the work begun in the basins, slips, and fabrication areas. The pier's structure includes elements of traditional timber pile and earth fill construction methods and later steel pile marine engineering techniques.
Subjects
Water SupplyWaste DisposalPiers (marine Landings)
Related Names
Massachusetts Water Resource Authority
General Dynamics Corporation
Brewster, Robert, Photographer
Fitch, Virginia A., Historian
Collection
Historic American Engineering Record (Library of Congress)
Contents
Back to Quincy, Massachusetts